Kapstan Elite & Kong Saltwater Spinning Reel Combo
- The reel and rod will be shipped in separate packages.
- S-Curve Graphite Rod Blank – Ultra-strong, lightweight, sensitive.
- Double-Foot Stainless Guides – Built tough for heavy braided lines.
- Strike Tip Design – Detect strikes instantly, even at night.
- IPX6 Waterproof Reel – 100% sealed for saltwater battles.
- Monster Drag Power – Up to 55LB smooth carbon drag.
- Aerospace Alloy Gears – Extreme durability & cranking strength.
- Heavy-Duty Build – CNC aluminum body, oversized power handle.
Product Details
| Model | KCOSPNKP-S30GM7M2 | KCOSPNKP-S40GM76MH2 | KCOSPNKP-S50GM8MH2 | KCOSPNKP-S60GM8MH2 | KCOSPNKP-S80GM10MH2 |
|---|---|---|---|---|---|
| Reel Type | 3000 | 4000 | 5000 | 6000 | 8000 |
| Gear Ratio | 5.7:1 | 5.7:1 | 5.7:1 | 5.7:1 | 4.9:1 |
| Ball Bearings | 6+1+1 | 6+1+1 | 6+1+1 | 6+1+1 | 6+1+1 |
| Max Drag (LBS) | 30 | 30 | 40 | 40 | 55 |
| Length | 7'0" | 7'6" | 8'0" | 8'0" | 10'0" |
| Action | Fast | Fast | Fast | Fast | Fast |
| Power | Medium | Medium Heavy | Medium Heavy | Medium Heavy | Medium Heavy |
| Line Weight (LBS) | 10-20 | 15-40 | 15-40 | 15-40 | 15-40 |
| Lure Weight(OZ) | 1/2-2 | 2-8 | 2-8 | 2-8 | 2-8 |
| Mono Line Capacity (LB/YDS) | 10/215, 12/145, 15/125 | 10/285, 12/190, 15/170 | 15/320, 20/245, 25/190 | 15/400, 20/305, 25/240 | 20/450, 25/355, 30/285 |
| Braid Line Capacity (LB/YDS) | 15/250, 20/180, 30/130 | 15/360, 20/260, 30/185 | 30/400, 50/315, 50/270 | 30/490, 40/390, 50/335 | 50/475, 65/390, 80/345 |
| IPT | 30.8 | 33.5 | 38.8 | 41.5 | 40.3 |
| Guides | 7+1 | 7+1 | 8+1 | 8+1 | 10+1 |
| Pieces | 2 | 2 | 2 | 2 | 2 |
| Rod Material | IM6, S-Curve | IM6, S-Curve | IM6, S-Curve | IM6, S-Curve | IM6, S-Curve |
| Price | 208.99$ | 218.99$ | 227.99$ | 256.99$ | 284.99$ |
received both rod and reel just took a little due to package separated thank you bentrod for making sure i got it ready to catch snook!
I finally got my complete package and thanks now
I finally got my complete package and thanks now I’m very happy. I love the product.
Really nice
Really good
Everything l get from you all is perfect can't thank you enough
Nice product , very happy
Smooth and powerful
Smooth rotations when fighting big fish and the feel of control. Definitely have lost fish due to equipment failures and this KAPSTAN ELITE is definitely NOT that and I can say that whole heartedly. The quality is there. bentrod is my new go to.
BUILT FOR SALTWATER FISHING
Specially engineered for offshore saltwater fishing. Kapstan Elite Spinning Reel is BenTrod’s highest level 100% Waterproof fishing reel at level of IPX6, with up to 15 EverSeal rubber rings to keep water out of the main gear. The BenTrod Intrusion Shield System includes labyrinth-style greased sealing grooves that reduce rotational resistance and provide an innovative water-tight seal.
Ultra-Smooth & Reliable
Each Kapstan Elite reel is equipped with 6 double-shielded stainless steel ball bearings that provide a superbly smooth feel even in rough conditions. Plus one special-designed polymer roller bearing that is high-strength and never rust, and one 8-pin stainless steel one-way bearing to prevent the flywheel from reversing.
Exceptionally Strong & Smooth Drag
This premium saltwater spinning reel is designed with a powerful braking force for reeling in Big Fish. Sizes 3000/4000 have an ultra-smooth triple-disc carbon fiber drag system and 30lbs max drag; 5000/6000 have a quad-disc carbon fiber drag system with 40lbs max drag; 8000 have a special double drag system, that consist of five front carbon fiber discs and one oversized spool carbon disc, to provide 55lbs max drag. Perfect for reeling in big game fish.
Powerful S-Curve Graphite Rod Blanks
BenTrod KONG series rods are designed for anglers targeting massive fish in fresh and saltwater! These lightweight, powerful, 100% graphite blanks are made of high-strength S-Curve graphite reinforced with Nano-Resin technology that delivers amazing strength and lifting power but are still incredibly light and sensitive.
Stainless-Steel Double Foot Guides
Because BenTrod KONG rods are made to handle giant fish, every component must be up to the challenge. We use only stainless-steel, double foot guides because of their strength and each guide has an ultra-smooth Titanium Oxide ring which is designed to perform flawlessly with heavy braided line. The combination of strong frames and durable rings are perfect for extreme conditions.